Engineering
Technical documents, submittals, RFIs and approvals
Total items
12
Submitted
2
Under review
3
Approved
5
Revision required
1
Open RFIs
4
Engineering register
| Document no. | Title | Project | Type | Discipline | Rev | Submitted by | Date | Reviewer | Status |
|---|---|---|---|---|---|---|---|---|---|
| ANR-STR-DWG-2410 | Level 24–28 slab reinforcement layout | Al Noor Residential Tower | Drawing | Structural | C | Ali Hassan | 14 Sept 2025 | WSP Middle East | Approved |
| ANR-SPC-03300 | Cast-in-place concrete specification | Al Noor Residential Tower | Specification | Structural | B | Consultant | 02 Mar 2025 | WSP Middle East | Approved |
| ANR-RFI-0187 | Clash between CHW riser and transfer beam at L6 | Al Noor Residential Tower | RFI | MEP | 0 | Meera Joshi | 18 Sept 2025 | WSP Middle East | Under Review |
| ANR-MS-FAC-012 | Unitised curtain wall installation method statement | Al Noor Residential Tower | Method Statement | Facade | A | Ali Hassan | 20 Sept 2025 | WSP Middle East | Revision Required |
| ANR-MAT-0419 | Porcelain tile material submittal | Al Noor Residential Tower | Material Submittal | Architectural | A | Sana Malik | 21 Sept 2025 | Al Noor Design Team | Submitted |
| MRN-STR-DWG-0102 | Raft foundation general arrangement | Dubai Marina Mixed-Use Complex | Drawing | Structural | D | Omar Siddiqui | 30 Aug 2025 | Atkins | Approved |
| MRN-RFI-0044 | Waterproofing lap detail at pile caps | Dubai Marina Mixed-Use Complex | RFI | Civil | 0 | Sana Malik | 16 Sept 2025 | Atkins | Submitted |
| MRN-TS-MEP-006 | Chiller plant technical submittal | Dubai Marina Mixed-Use Complex | Technical Submittal | MEP | B | Al Shirawi MEP | 11 Sept 2025 | Atkins | Rejected |
| KZD-TS-REF-011 | Refrigeration system technical submittal | KIZAD Logistics Warehouse | Technical Submittal | MEP | A | Karthik Raman | 25 Aug 2025 | AD Ports Engineering | Approved |
| SHJ-RFI-0032 | Radiation shielding thickness for CT room | Sharjah Community Health Clinic | RFI | Architectural | 0 | Priya Nair | 09 Sept 2025 | SHA Engineering | Under Review |
| SHJ-SPC-22600 | Medical gas systems specification | Sharjah Community Health Clinic | Specification | MEP | A | Consultant | 10 Jun 2025 | SHA Engineering | Approved |
| ANR-RFI-0181 | Balcony balustrade fixing detail | Al Noor Residential Tower | RFI | Architectural | 0 | Ali Hassan | 28 Aug 2025 | WSP Middle East | Under Review |
ENG
Engineering Agent
Reads technical documents, specifications, drawings and RFIs.
Engineering Agent is ready
Ask for an analysis, recommendation, report, comparison or draft using the current demo operation data.